1. The maintenance cycle of refined carving equipment is generally set to be well maintained once in 3 months.
2. Open the X -axis cover, clean up the crumbs and dirt on the screw and rail (with silk), and insist on dry and regular.
3. Open the Z -axis cover and connecting the cover, clean up the screws, dandruff and dirt on the guide rail, check whether the Z -axis connection plate is loose, check whether the dragging chain connecting plate is loose, check the X -axis original point switch board and the collision board and Is the itinerary limit switch changed or not, and the screws are loose.
4. Remove the shot or shield on the Y -axis, clean up the screws, on the rail and dandruff and dirt, and the waste dandruff under the operating table must be cleaned up. Loose, whether it is reliable.
5. Check the connection of the connection cable.
6. Enter JDTEST to detect the signal bits, the characteristics of each axis trajectory, admit that after correctly, run in EN3D for 30 minutes, and the operation is normalized for timely maintenance!
·The advantages and application areas of CNC machining ·CNC Processing Center's craftsmanship and characteristics ·Solution of retracting neck and cracking in precision hardware processing ·The role of precision machining processes ·How to process the mold for mold processing center ·What is the difference between a gantry machining center and a horizontal machining center · What are the processes for processing precision mold parts? ·How to change the tool on CNC machine tools ·CNC Technology - A New Power for Industrial Manufacturing ·How to eliminate the error of CNCC processing